Like much of the western and southwestern U.S., California has experienced drought conditions on and off for decades. Fortunately, the regulatory landscape is starting to catch up with water treatment technology, paving the way for states and localities to effectively create a new and reliable supply of potable water.

Since

Introduction

America’s water infrastructure has long faced a critical need for funding and modernization. According to the American Society of Civil Engineers, there is a $105 billion funding gap for drinking water and wastewater infrastructure projected over the next two decades.[1] The Infrastructure Investment and Jobs Act (IIJA) addresses this issue head-on, allocating $55 billion to water infrastructure — the largest federal investment of its kind in the nation’s history.[2] However, the significance of the IIJA extends beyond its substantial funding. It distinguishes itself through a deliberate emphasis on efficiency, innovation, and collaboration in project delivery — a strategic focus that aligns seamlessly with the core principles driving successful public-private partnerships (P3s). As a result, the IIJA emerges as a catalyst, paving the way for the increased use of P3s in transforming America’s water infrastructure. This convergence of the IIJA’s ambitious objectives with the inherent advantages of P3s presents an extraordinary opportunity to revitalize our water systems, creating infrastructure that is resilient, sustainable, and capable of meeting future challenges.