Harvey Robbin Co. v. Cristwood Contracting, Inc.,
1995 Conn. Super. LEXIS 2633 (Conn. Super. Ct., Sept. 13, 1995).
Statute requiring bidder for public contract to list subcontractors did not require bidder to utilize subcontractor where subcontractors bid exclusions were not communicated until after submission of prime bid.
Plaintiff Harvey Robbin Company, a subcontractor for HVAC (“Subcontractor”) sued Defendant Cristwood Contracting, a general contractor (“Contractor”), in connection with the construction of a physical plant at the University of Connecticut. The Subcontractor alleged, inter alia, breach of contract and detrimental reliance. In turn, the Contractor denied the Subcontractor’s principal allegations, and alleged misrepresentation on the part of the Subcontractor, and that no contract was entered into by the parties.
Continue Reading Connecticut Court Holds Prime Contractor not Required to Utilize Subcontractor Listed in Its Bid, Where It was Unaware of Bid Exclusions Later Presented by Subcontractor